Skip to product information
1 of 8

HDLNKAK

HDLNKAK Table Saw Digital Dial Indicator Gauge, for Aligning and Calibrating Work Shop Machinery Like Table Saws, Band Saws and Drill Presses

HDLNKAK Table Saw Digital Dial Indicator Gauge, for Aligning and Calibrating Work Shop Machinery Like Table Saws, Band Saws and Drill Presses

Regular price $64.78 USD
Regular price $64.78 USD Sale price
Shipping calculated at checkout.

About This

  • 【Professipnal Table Saw Gauge】Table Saw Gauge is designed according to the miter slot (3/8 "x 3/4") and can be used to check table saw blade and saw grid alignment, tool bar and saw blade jumper, miter groove and saw blade perpendicularity, tool bar/chuck jumper, joint/planer head and table parallelism, joint/planer alignment, discharge table alignment; Router/shape spindle runout, or any other setting or calibration measurement you want.
  • 【High quality Digital Dial Indicator】 Digital Dial Indicator has a measuring range of 0 ~ 25.4 mm(0 ~ 1 in), a high resolution of 0.01 mm(0.0005 "), and can be switched between mm and inch, with zero setting function. Electronic readings are more convenient.
  • 【Easy to Install】 Quickly set up, adjust, and check the accuracy of your store's tools with this system. Get the best performance and accuracy out of your woodworking.
  • 【Premium Material】2Pcs 3.2 "adjustable anodized Alumina rods, machined by CNC machine, strong enough to provide stability; The 3 chute partitions can provide different lengths of distance.
  • 【 Package includes 】1 x Digital Dial Indicator, 2 x Square nut, 2 x Spring plunger, 2 x Hex socket nut, 2 x Hex socket wrench, 1 x Metal gasket.
View full details